Project

The project will entail the complete replacement of the existing structure with a new bridge with replaced abutments and pedestrian sidewalks. The project is currently in Preliminary Engineering and is navigating the cultural/historical clearances associated with the bridge's location and designation as a contributing resource to the Kutztown Historic District. This project is currently scheduled to be let for bids via PennDOT's ECMS system in December 2019.
 